Archaeological Data Review and Inspection of the Big Spring Water Reclamation Plant Project

2010

Etech Environmental and Safety Solutions Inc. contracted the Center for Big Bend Studies (CBBS) at Sul Ross State University to perform background research, intensive (100%) pedestrian survey, and subsurface testing for the Big Spring Water Reclamation Project. One small site (41HW89)—a lithic scatter—was documented during the project but subsurface testing revealed deposits that were both disturbed and that contained modern trash, likely from the adjacent municipal landfill.